Register your apartment building for ARENA-backed EV charging

ReadySteadyPlug is rolling out managed EV charging in apartment and strata buildings, supported by $1.51 million in funding from the Australian Renewable Energy Agency under the Australian Government's Driving the Nation Program.

If you live in an apartment and want to charge at home, here is how it works and how to get your building assessed.

A person holding a smartphone displaying a strata ev charging app with a speedometer-like gauge at 3.77 kW, scheduled charging times, and energy consumption details.

Backed By Driving the Nation Program

ReadySteadyPlug has received $1.51 million in funding from the Australian Renewable Energy Agency (ARENA) under the Australian Government's Driving the Nation Program.

For your building, this means two things. The model has been assessed and backed by the national renewable energy agency. And buildings that join the current rollout are part of a funded program designed to make EV charging simpler and more affordable for strata communities.

EV charging the whole apartment building can agree on

When EV charging goes to a vote, most of the people deciding do not own an EV. Our system is built around that. Residents fund their own charge points and pay for their own power, and the building keeps its existing electrical supply.

An icon of a clock with an angry face and a lightning bolt above it, representing a warning or warning about time or battery issue.

No switchboard upgrade

Charging with RSP works inside the electrical supply the building already has. We measure your building's real capacity before designing the system rather than assuming it.

A battery icon with a lightning bolt, indicating charging or high power, placed above bar graph with increasing bars from left to right.

Start small, grow later

More residents add charge points as they go electric, at no further cost to the Owners Corporation.

A clock with a lightning bolt in the center indicating charging or electricity.

Never overloads the building

Dynamic Load Management keeps total load within the building's supply limit at all times.

A shield with a dollar sign in the center and a green lightning bolt in the top right corner.

Each resident pays their own way

Individually metered and billed. The Owners Corporation is reimbursed for the power used. Residents who do not want a charge point do not pay for the infrastructure, or for the electricity they do not use.

What the system looks like

Secure charging

Standard 15A outlets with controlled access, energy metering, and user billing.

An electrical panel with a sliding cover labeled 'ReadySteadyPlug'.

Centralised control

A controller manages charging across the building and prevents electrical overload.

Smartphone displaying an energy management app with a gauge showing 2.50 kilowatts of charging power, temperature readings, and energy consumption details

User-Friendly App

Residents track usage and billing. Managers monitor and manage the system remotely.

Getting EV charging into your building

How strata buildings go from initial enquiry to charging.

  1. 1

    Discovery

    We get to know your building and confirm what is possible, usually with no switchboard upgrade.

  2. 2

    Design

    We design your system and put real numbers on the table, with a fixed quote for your building.

  3. 3

    Approval Your part

    Your owners vote it through at the AGM or EGM. This is the one part we need the building on.

  4. 4

    Reservation

    Interested residents lock in their charge point and we finalise the configuration.

  5. 5

    Installation

    We install, pair the app, set up direct billing and switch it on.

  6. 6

    Growth

    New residents join whenever they go electric, at no extra cost to the strata.

Case Studies

Modern multi-story apartment building with balconies with EV charging installed in the car parks.

Meadowbank, NSW

Multi-level basement charging delivered to 154-lot Meadowbank strata with no Wi-Fi or mobile signal, fully managed at building level.

Learn more

Modern multi-story residential strata building with EV charging in Australia.

North Ryde, NSW

EV charging rolled out for a 160-lot North Ryde strata without major upgrades, starting small and designed to scale to full coverage.

Learn more

What our customers say

"At Kingston Quarter, we were looking for an EV charging solution that was fair to residents, sustainable for our electrical infrastructure, and easy for the strata committee to manage. ReadySteadyPlug delivered exactly that.

What stands out most is how cleanly the system scales. Because of RSP's true end-user-pays model, our expansion comes at no additional cost to the Owners Corporation. Furthermore, the backend energy-monitoring system has been a highly useful tool — it allows us to easily understand our available electrical headroom, actively manage maximum demand, and keep a close eye on related charges.

We are extremely happy with RSP and highly recommend their solution to other strata communities."

Paul, Chair of OC

Kingston Quarter, Meadowbank NSW (154 lots)

Modern multi-story apartment building with colorful accents and balconies, situated on a street with small trees under a partly cloudy sky.
Modern multi-story apartment building with white, gray, and wood exterior, black window frames, and landscaped surroundings on a sunny day.

Is Your Building a Good Fit?

ReadySteadyPlug is actively rolling out managed EV charging across strata buildings Australia-wide. We're looking for buildings that are ready to move, and we want to make it straightforward to get started.

Our Charging-as-a-Service model means minimal upfront capital cost for the Owners Corporation, no complicated infrastructure, and no ongoing management headaches. If your building is a good fit, we can get things moving quickly.

EV charging for apartment buildings

What we need from your building

To be considered for our current rollout, the following criteria need to be met:

  • Minimum of 5 charge points to be installed

  • Strata committee able to review and approve within the next 3 months

  • Building willing to participate in managed charging, including monitoring to support off-peak and solar-period use

  • A committee member or strata manager will be the primary point of contact

Let’s get you started

ReadySteadyPlug is rolling out managed EV charging across strata buildings Australia-wide. Check your eligibility, see what's involved, and register your building below to start the conversation